<< Click to Display Table of Contents >> SM-J-Q BOM Recursion Utility |
![]() ![]() ![]() |
SM-J-Q BOM Recursion Utility
Purpose of Program
Use this program to check your BOM structure for "Loops" - an item entered in a lower level of its own Bill of Materials. Such loops can cause the MRP generation and Standard cost rollup programs to run forever.
General Program Operation
Enter from/thru ranges of items and indicate which types to include. Including nested detail means that the report will show the levels and sublevels that have the loop. If a problem is detected, the BOM will be shown on the report. If none are found, the report heading will print with no entries.